Bolt-In Design Accelerates Lock Repairs Bolt-In Design Accelerates Lock Repairs
Bolt-In Design Accelerates Lock Repairs

Lockport Lock, Illinois River Mile 291, is expected to remain closed until the evening of May 19 as repair crews install new pintle sockets. The closure, which began… Read More

Lockport Lock, Illinois Waterway River Mile 291.1, fully reopened to navigation May 19 after a temporary closure that began March 31 to complete essential infrastructure repairs and maintenance activities,… Read More

In just the past few years, the barge industry has had to contend with a number of unscheduled lock and dam closures, including those at Wilson Lock, Holt Lock and Demopolis Lock in Alabama. It also… Read More